GE PG 6571-B 40MW 50Hz Dual Fuel Gas
Turbine Generator
Fuel: Liquid/Gas
Fired
Rating: ISO rated @ 39.5MW:
(Gas-fired)
Voltage: 11.5Kv
Phase: 3
Frequency: 50 Hz
pf: 0.8
PERFORMANCE
The performance of the
fully serviced and “0” houred Gas turbine is as follows:
Frame
6571:
Output
& Heat rate at ISO conditions of 15 Degs. C and 1013mBars (Sea Level)
|
FUEL
(LHV)
|
OUTPUT
(kWs)
|
Heat
Rate (Btu/ Kwhr)
|
|
GAS
|
40,700
|
10,645
|
|
DISTILLATE
|
40,000
|
10,700
|
N.B.
Water injection will increase the output figures by approximately 8%.
These
performance figures will be obtained when the following operating/ambient
conditions apply:
Gas Turbine
Unit PG 6571
Ambient Temperature 15°C
Atmospheric Pressure 1013 mbar (a)
Humidity 60%
Inlet Duct Losses 4 inches WG
Exhaust Duct Losses 2 inches WG
Fuel Natural Gas /
Distillate to OEM Specification.
This
performance is subject to the following:
- Each test
to establish the performance figures shall be made when:
- The gas
turbine is commissioned and is in a clean and in proper working
condition.
- Using a
fuel of an acceptable quality as specified above.
- Distillate
fuel inlet pressure to the on base liquid fuel flange of 40 to 55 psig.
- The
contractor is witness to the test.
- The
tests, procedure and method of measurement (including margins to cover
errors in observation and measurement) to establish the operating
specifications shall be mutually agreed before commencement of the tests.
Prior to commencing the actual testing the main contractor will provide
specific customized data sheets for recording the unit parameters.
- Method of
measurement of ambient air temperature and ambient pressure shall be
agreed.
- All
performance tests shall, unless otherwise agreed to be carried out
immediately following the date that the gas turbine is ready for such
tests.
1.
Scope of
Supply
Gas
turbine Frame 6B complete with the auxiliaries:
- 17 Stage,
axial flow, heavy duty compressor with variable guide vanes
- 10
Combustors of reverse flow design each with - 1 fuel nozzle, 2 spark plugs
- 4 UV type
flame detectors
- Stage
power turbine with horizontal split casing
- Accessory
gear box
- Load,
accessory and generator couplings
- On base
lube oil system
- 2x100%
lube oil coolers
- Accessory
gear shaft driven gear type main lube oil pump
- 415/480
volts AC motor driven aux. oil pump
- DC motor
driven emergency centrifugal oil pump
- Lube oil
tank with heater
- 2x100%
oil filters
- Lube oil
piping complete - pipes, flanges, hardware : (SS piping
after filter)
- GTG drain
oil piping - pipes, flanges, hardware
- 2x100%
oil de-mister fans & motors
- By-pass
valves, re-circulation valves, piping sections, fittings & hardware,
local pressure gauges, Return pipes
- Control
& protection system
- Shaft
driven hydraulic oil Pump
- Cables
for interconnection between control panel & GT junction boxes
- Control
& hydraulic oil piping with flanges and hardware in stainless steel
- N2
Pressure accumulator in hydraulic oil circuit
Fuel
system
- Single
mechanical flow divider
- Safety
shutdown valve (fuel pressure to open)
- Emergency
stop valve
- LP fuel
filter, on-line filling line, drain Lines, DP gauge and DP switch, drain
lines
- Fuel
changeover 3-way valve
- HP filter
after fuel injection pump
- Fuel control
valve
- Interconnecting
piping, fittings, flanges and coupling & hardware
- Fire
detection & CO2 system for the skid/container
- Standard
fuel piping, fittings, strainers, safety shutdown, venting and gas
distribution arrangement
- Liquid
fuel safety shutdown - quick shutdown valves, solenoid valves, pressure
switches
- Atomizing
air system
- Shaft
driven Atomizing Air compressor
- Starting
compressor driven by diesel engine
- Atomizing
air cooler
Drainage
system
- Drain
piping complete with isolation valves for water including off-line
compressor wash water flow.
- Drain
piping complete with isolation valves for oil (lube oil/diesel engine fuel
and GT fuel)
Air
inlet system with filtration system
- Support
structure, panel walls, bracing, structural supporting columns, rain hood,
ladders, gratings, hand railings,
- Ladder
& platform, lifting devices, filter house panels, tube sheets
- Cylindrical
& cellulose filter elements
- Clean air
plenum
- Control
panel, cables, terminal box
- PI and
PT, TI and TE at compressor inlet, DPG and DPS across the filter assembly
- Mist
separator
- Access
doors, internal lighting
- Hardware
for filters- element support yokes, retention nuts, washers, gaskets
- Connecting
hardware - nuts, bolts, washers, gaskets
- Air inlet
duct with silencer & structural support including expansion joints
- Exhaust
gas system
- Expansion
joint with a mating flange, bolts, nuts
- Distance
piece between expansion joint & gas turbine exhaust flange
- Gas
turbine acoustic enclosure
Fire
protection system (includes generator exciter protection) as per NFPA 12A
- Load cell
mounted 25 nos. CO2 cylinders with piping etc. in a container
- Spray
nozzles, distribution piping & control system, fittings
- Break
switches for CO2 release
- Heat
detector type fire detectors in each compartment/ zone
GT
starting system
- Diesel
engine including fuel supply/ injection system, cooling system, piping
spools, interconnecting piping with all fittings, flanges hardware,
exhaust silencer
- Valves
for various services like water, fuel, lube oil etc.
- Miscellaneous
piping, hardware, fittings (valves, flanges)
Generator
(air to water cooled) and auxiliaries
- Brush-less
excitation System
- General
phase & neutral side CTS (for protection, metering & AVR)
- Generator
PT (for protection, metering & AVR)
- Generator
instrumentation, control & synchronizing panel
- AVR
- AVR
manual channel
- Generator
protective relays
- Central
protection unit
- 87G-generator
differential
- 51V-overcurrent
volt restraint
- 50-instantaneous
over-current
- 59G-over
voltage
- 51N-neutral
over-current – 95%
- 64G-stator
earth fault – 90%
- 46-negative
phase sequence
- 40-loss
of excitation
- 32-reverse
power
- 37- low
forward power
- 81-frequency,
2-stage
- 60-voltage
balance relay
- 27-under
voltage
- 86G-generator
lockout relay
- Block
differential protection - KBCH130 relay (numerical type) consisting of
- 24-
volt/hertz relay
- 87B-
generator, generator transformer and unit auxiliary transformer
differential
- Other
protections not configured in LGPG111 and KBCH130
- 76-
excitation over-current
- 60EX-
excitation voltage balance
- 60AVR-
AVR power supply fault
- 49G-
stator over temperature
- 49NGT-
NGT over-temperature
- 49ET-excitation
transformer over temperature
- 64R-
rotor Earth fault
- 21G-
back-up impedance relay
- 25-
synchro-check relay
- Generator
neutral side CTS
- Generator
neutral side to neutral cubicle connections
- Load gear
box complete
Control
& Instrumentation System
- Speedtronic
MARK-VI control package with following features:
- Turbine
control panel
- Generator
control & protection panel
- Generator
excitation panel
- Fire
protection panel
- Gas
detection panel
- 125V DC Ni-Cd
batteries and battery charger
- 415Volts
MCC (2 In-comers) for GTG auxiliaries (short circuit capacity 50 kA)
- DCDB
- Standard
accessories for the above:
- Air
conditioning unit, integral cables, connectors, junction boxes, terminals
- Mounting
racks, supporting hardware
- UPS
- Operator
work station in GT control package
2.
Commissioning
Services
Initial
start-up, system check-out, initial operations, commissioning and customer
personnel training will include the following:
- Service
engineers and technicians to oversee and direct the initial start-up,
system check-out, field acceptance tests, initial operations and
commissioning of the power plant. An hourly rate is included for 1000
hours for this support.
- USP&E
Global will provide operations training of a class of up to five (5)
customer personnel for the gas turbine generator sets and related
equipment. The training will consist of class room and hands-on training
for the completed gas turbine generator set installation, excluding the
heat recovery units. The operations training course will require five (5)
continuous days of dedicated time by customer personnel and will take
place during the installation of the turbine generator package.
- USP&E
Global will recommend a nominal supply of consumable and replacement components
for to purchase concurrently with the manufacture of the equipment, in
sufficient quantity for use during the start-up, check-out and
commissioning and as projected for one full year of operation. Customer
will be expected to purchase these items and to replenish the stock as
items may be used or consumed. Note: this paragraph will be superseded
by any Comprehensive Service Agreement entered into between the Customer
and USP&E Global as desired.
- USP&E
Global will provide to customer a supply of components that should be on
hand during the first two years of operation of the gas turbine in the
event of premature failure of those components. Customer will provide dry,
clean storage for such components and make them available to USP&E
Global service technicians as required.
3.
Packaged
Generator Set Proposal Drawings
Major Systems
|
1.
P&ID
Compressed Air
|
2.
P&ID Water
Wash
|
|
3.
P&ID Fire
Protection
|
4.
P&ID Lube
Oil System
|
|
5.
P&ID
Instrumentation
|
6.
P&ID
Ventilation
|
|
7.
P&ID Fuel
Injection
|
8.
Inlet Air
Filter
|
|
9.
Air Inlet Plenum
|
10.
Bellmouth
|
|
11.
Enclosure Base
|
12.
Enclosure
Structure
|
|
13.
Enclosure
Panels
|
14.
Start System
Variable Frequency Drive
|
|
15.
Coupling
(LOW/HIGH Speed)
|
16.
MCC
|
|
17.
Electrical
wiring & trays
|
18.
High Voltage
equipment
|
|
19.
Exhaust
Silencer, Duct, Expansion Jt.
|
20.
Engine Mounts
|
|
21.
Fabrication Labor
|
22.
Static Testing
|
4.
Warranty
Twelve (12) months from date
of completion of commissioning, not to exceed eighteen (18) months from
shipment. For further details, please see Terms and Conditions of Sale in the
addendum to this proposal.
5.
Performance
Bonding
USP&E will work with
Buyer to determine an appropriate level of performance bonding in order to get
this project accomplished. The cost and collateral requirements of such bonding
shall be borne equally by both parties.
Representative Photos